02 / THE CLUSTER
From racks to a cluster
A rack holds the computers. A network joins racks so a workload can use them together. This simplified row shows where the switches and connections sit.
Compute racks
Servers and GPUs perform the work.
Leaf switches
Local switches collect traffic from the racks.
Spine switches
Shared switches connect those local groups.
One representative layout, not a construction drawing. Lines show logical connections; a real connection may need several lanes or cable assemblies. In the rail view, each long line groups many point-to-point links—it is not one shared physical cable.
Drag to look around · pinch or scroll to get closer
Physical layout assumptions & sources
- Decision supported
- Does the physical layout match the quoted logical fabric?
- Primary output
- Placement, cabling, and failure-domain diligence
- Evidence boundary
- Representative row, not a construction drawing or cable schedule
Physical-design diligence
The topology diagram becomes a placement and port map. A supplier's logical leaf and spine tiers must resolve to physical switches, ports, cable assemblies, and pathways. This illustration places leaves at top of rack and spines at end of row; other designs use middle-of-row, centralized, or distributed placement. Ask for both diagrams and reconcile them.
Distance and line rate determine media. Short links may use passive copper; longer or faster links may require AEC, AOC, or optical assemblies. A logical edge may map to multiple lanes or cables, and the cost depends on the actual bill of materials. At 2:1, this illustration removes half the leaf-to-spine capacity; an actual assembly count requires a port map. Model the communication sensitivity →
Rails change both cost and failure shape. In the single-plane illustration, removing a rail switch affects the corresponding path across attached nodes. Redundant planes, routing, and collective configuration determine whether jobs stall or continue at reduced bandwidth. Configure the topology estimate →
This model keeps the wiring readable: eight racks, four spines, and one drawn line per logical uplink. It does not size network interfaces, lanes, cable assemblies, cooling, or power. Treat the room as a way to trace connections before reviewing the actual design.
schematic representative row · logical edges are not a construction cable schedule · model version 2026.08 · methods & limitations